Quick answer
Three things set Northern Ireland apart for a church thinking about solar. There is no Smart Export Guarantee, so the array should be sized to what the building uses rather than to the roof. The planning rules are Part 37 of the NI permitted development order, not the English or Scottish classes. And the one grant that fitted, Power NI's NISEP-funded 20% grant, has closed for applications for 2026/27; Power NI expects the next round to open in April 2027, subject to funding approval. On those terms the case rests on self-use: a church hall or school used on weekdays will do far better than a building used mainly on Sunday.
Consent
Denominational approval
Each denomination in Northern Ireland has its own property procedures. We have not found a published procedure for solar panels on the Church of Ireland or Presbyterian Church in Ireland websites, so the first step is your diocesan office or presbytery, before drawings are commissioned. Catholic parishes should start with the diocese.
Listed churches and the ecclesiastical exemption
Section 85(8) of the Planning Act (Northern Ireland) 2011 exempts "an ecclesiastical building which is for the time being used for ecclesiastical purposes" from listed building consent (legislation.gov.uk). That exemption does not remove planning control: the Department for Communities says churches "require planning permission for external development, i.e. extensions and other alterations" (DfC, work to churches). Its Historic Environment Division is a statutory consultee to councils on listed building consent, and listed buildings in Northern Ireland are graded A, B+, B, B1 and B2 (DfC, listed buildings).
Part 37 permitted development
Roof solar on a non-domestic building is Part 37, Class A of the Planning (General Permitted Development) Order (Northern Ireland) 2015 (NISR 2015/70). The conditions that usually decide a church:
- On a roof slope that faces onto and is visible from a road, panels may not project more than 20 cm from the slope.
- On a flat roof they may not stand more than 2 metres above the highest part of the roof or sit within 2 metres of its edge.
- They may not extend beyond the edge of the roof slope or wall, or above the ridge.
- In a conservation area or World Heritage Site, nothing on a wall or roof slope that faces onto and is visible from a road.
- Within the curtilage of a listed building, only where listed building consent has already been granted for the work.
Ground-mounted panels fall under Class B, limited to 30 square metres and 2 metres high. Our consent guide covers the drawings and heritage statement any planning officer will want.
Funding: what is open, and what is not
Northern Ireland has fewer routes than Great Britain, and the honest summary is that a church should expect to fund most of an array itself. Checked 3 November 2026:
| Route | Status | For a church |
|---|---|---|
| NISEP Commercial Energy Saving Scheme (Power NI) | Closed for applications for 2026/27; Power NI expects the next round to open in April 2027, subject to funding approval | The scheme list covers "All commercial / non-domestic properties, in Northern Ireland". It paid a 20% grant with the applicant paying 80%, and the solar PV grant was capped at £30,000. Confirm with Power NI whether your church qualifies for the next round. |
| Benefact Trust building grants | Rolling, UK-wide | Lists renewable measures including solar; competitive. |
| Invest NI Energy Efficiency Capital Grant | Paused | Invest NI has paused the scheme to review it, with no reopening date. |
| Northern Ireland Renewables Obligation | Closed to new generation since 31 March 2017 | No ROCs for a new church array. |
| Listed Places of Worship Grant Scheme | Closed to new and returning applicants | Church solar is zero-rated for VAT instead (below). |
Source for the 2026/27 closure: Power NI (powerni.co.uk). Source for the NISEP terms: the Utility Regulator's NISEP list of schemes 2026/27, page 33 (uregni.gov.uk).
Export: no SEG, a supplier rate instead
Ofgem's Smart Export Guarantee requires installations to be in Great Britain, so it does not apply here (Ofgem). Power NI's micro-generation export tariff is 11.88p per kWh from 1 October 2026 to 30 September 2027 (Power NI); other suppliers set their own rates. Because exported units usually earn far less than the church pays for imported ones, the array should match daytime use. A battery can help a building used mainly in the evening; see the payback calculator to test both.
Grid connection: NIE Networks
NIE Networks is the only distribution network operator in Northern Ireland, and the Utility Regulator, not Ofgem, regulates it. Under G98/NI a system of up to 3.68 kW on a single phase, or under 11.04 kW on three phases, can be connected with the commissioning documents sent within 30 days (NIE Networks G98/NI). Anything larger needs a G99/NI application, including the Fast Track route, approved before installation. GB connection reforms do not apply here.
What a roof in Northern Ireland generates
PVGIS, the European Commission's solar model, gives these long-term annual averages for 1 kW of panels at the best tilt with 14% losses (PVGIS 5.3, run 3 November 2026):
- Belfast: 922 kWh per kWp a year
- Enniskillen: 854 kWh per kWp
- Derry/Londonderry: 843 kWh per kWp
At a 10° tilt facing south the range is roughly 769 to 828 kWh per kWp. These are modelled averages, not a guarantee for any one roof.
VAT, targets and the wider picture
Solar on a building used solely for non-business charitable purposes is zero-rated across the UK, Northern Ireland included: charity buildings have qualified since 1 February 2024, and the 0% rate runs to 31 March 2027 before moving to 5% (church solar VAT). The Climate Change Act (Northern Ireland) 2022 sets net zero by 2050, at least a 48% cut in net emissions by 2030 and at least 80% of electricity consumption from renewables by 2030 (DAERA). The Department for the Economy's Energy in Northern Ireland 2026 counts 32,342 solar PV sites.
If there is no grant, or 20% isn't enough
NISEP is closed for 2026/27, and when it is open it leaves 80% to find. Two routes cut the upfront cost further without depending on a larger grant:
- Size for self-use and pay outright. A smaller array matched to weekday use keeps the cost down and the payback honest: what church solar costs.
- A power purchase agreement. A provider owns the panels and the church pays only for the electricity it uses; with no SEG, the agreed rate has to beat what the church pays now: church PPAs explained.
This guide covers the UK; the Republic of Ireland is a separate market. Churches across the water in Scotland can read church solar in Scotland.
Check the Northern Ireland funding routes
Northern Ireland is already selected. Answer the rest and the routes appear on this page; leave your email only if you want us to reply.
Church solar in Northern Ireland: common questions
Is there a grant for church solar panels in Northern Ireland?
Not for 2026/27. Power NI's NISEP-funded grant for business solar PV (20%, capped at £30,000) has closed for applications for 2026/27; Power NI expects the next round to open in April 2027, subject to funding approval. Check with Power NI whether a church qualifies for the next round before you count on it.
Does the Smart Export Guarantee apply in Northern Ireland?
No. Ofgem says SEG installations must be in Great Britain. In Northern Ireland the export rate is set by your supplier: Power NI pays 11.88p per kWh from 1 October 2026 to 30 September 2027 on its micro-generation tariff.
Do churches in Northern Ireland need planning permission for solar?
Often not for an unlisted church outside a conservation area, provided the panels meet Part 37 Class A of the Planning (General Permitted Development) Order (NI) 2015. On a listed church, or on a road-facing slope in a conservation area, permission is needed. The Department for Communities notes that churches require planning permission for external development such as alterations.
Who connects a church array to the grid in Northern Ireland?
NIE Networks, the only distribution network operator in Northern Ireland, regulated by the Utility Regulator rather than Ofgem. Small systems up to 3.68 kW single-phase or 11.04 kW three-phase follow G98/NI, with commissioning documents due within 30 days; larger systems need G99/NI approval before installation.
What is Northern Ireland's climate target?
The Climate Change Act (Northern Ireland) 2022 sets net zero by 2050, at least a 48% cut in net emissions by 2030, and at least 80% of electricity consumption from renewable sources by 2030.
Do you cover churches in the Republic of Ireland?
No. This guide covers the UK. The Republic of Ireland is a separate market with its own regulator, grid operator, VAT rules and grants.
Sources, checked 3 November 2026: Utility Regulator (NISEP list of schemes 2026/27); Power NI (micro-generation tariff); Ofgem (SEG); NIE Networks (G98/NI limits, G99/NI); legislation.gov.uk (Planning Act (NI) 2011 s.85; NISR 2015/70 Part 37); Department for Communities (work to churches; listed buildings); Invest NI (Energy Efficiency Capital Grant); DAERA (Climate Change Act (NI) 2022); Department for the Economy (Energy in Northern Ireland 2026); PVGIS 5.3. UK-wide funders are on grants for churches.